Below is an interactive map showing City infrastructure projects such as sewer, water, paving, street lights, etc.

For information about building construction on private property, click here.

Interactive Construction Projects Map Click Here

 N 42nd Street Reconstruction (University - Gateway)
                                 

North 42nd Street from University Ave. to Gateway Drive is open to traffic.  

The project consisted of complete reconstruction, shared-use path, and a new signal at 6th Ave. North

Landscaping south of 6th Ave. North and permanent pavement striping will be done the summer of 2019.

 Kennedy Bridge Rehabilitation

The bridge was opened to 4 lanes of traffic on December 19, 2018.

Additional work including roadway grinding, permanent pavement striping, landscaping and restoration of work areas will be done summer of 2019.

 Paving 47th Ave S (Columbia Rd to S 20th St)
 

The manufacturing of the street lights has been delayed as with the traffic signals in the following project below.  

The project is a reconstruct from a rural section to an urban section road. The project includes a shared use path along the south side and storm sewer upgrades.

47th Ave S is open to traffic.

Traffic Signals at Washington St. and 44th Ave. South
  The roadway work at the intersection has been completed for several months; however, the installation of the traffic signals has been delayed due to a regional  manufacturing backlog.  The signals are scheduled to be installed by Mid-January 2019.

Detour Maps

 Detour Map for Kennedy Bridge
 Detour Map for Kennedy Bridge Rehabilitation
Detour, Mill, Road, Construction
 Detour Map for Mill Road Expansion

 

 Geographic Roadway Inventory Tool (GRIT)