Cherry St. Mill & Overlay

Print
Press Enter to show all options, press Tab go to next option

Project Overview:

The rehabilitation project consists of removing the top surface of the existing asphalt, paving a new asphalt overlay, replacing damaged curb, repairing settled catch basins, and other miscellaneous repairs.  This existing concrete roadway was constructed in approximately 1950 with 6 inches of concrete on a clay base.  The concrete surface received a 1 ½ inch asphalt overlay in 2000 and that was seal coated in 2008.


Estimated Project Cost:

$174,000


Special Assessment District:

Cherry St. Mill & Overlay