Show/Hide

Limit Water Usage:

After last night's heavy rain, the city's wastewater plant is running a full capacity.  The city is asking residents to limit their water usage this morning so the wastewater plant can get caught up

Road Construction

Bid/RFP Posts List

Print
Press Enter to show all options, press Tab go to next option

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer

Alerus Center Turf Replacement Phase I; Modular Turf Protection System

  • Department:Engineering
  • Category:Sealed Bids, City-Owned Building/Structure Construction or Rehab, Miscellaneous Other Project
  • RFP Number:8072.1
  • Start Date:07/11/2019
  • Close Date:08/01/2019 2:00 PM
Return to full list >>